Substrate Preparetion
Mixing
Application
1. Apply with brush or roller when a smooth finish is required 2 coats.
2. The second coat should be applied, allowing 30-90 minutes apart between each application.
3. When finished, surface should be left to dry for at least 3 days.
4. Tile work should be done on surface after 3 days.
5. Depend on temperature and relative humidity conditions on site. Normally will require a minimum of 7-14 days depending on ventilation. Ensure that the product has cured enough to be in permanent contact with water.
Estimated Coverage
1-1.5 kg/sq.m/ 2 coats
Caution
Storage
It should be kept in a dry place and the temperature is not too high to avoid
product’s degradation. Age of product is 1 year.